greeksoup/ stock research

Portland General Electric (POR) FY2025 results: revenue $3.6 billion, up 4.0% on the year

Portland General Electric Co. (POR) reported revenue of $3.6 billion for fiscal 2025, the year ended 31 December 2025, up 4.0% on the year before. Net income was $306 million, down 2.2%, and diluted earnings per share $2.77. The figures are the company's own, from the 10-K it filed with the SEC on 17 February 2026.

Revenue
$3.6 billion
+4.0% on the year
FY2018FY2025
Operating margin
15.5%
14.9% a year earlier
FY2018FY2025
Net income
$306 million
-2.2% on the year
FY2018FY2025
Diluted EPS
$2.77
-8.0% on the year
FY2018FY2025

this yearthe year beforeHover a bar for its figure.

The year in brief

What management said about the year

Guidance figures: 9 new, 2 kept.

  • Full-year non-GAAP EPS was $3.05: Non-GAAP adjusted EPS was $3.05, compared with $3.14 in 2024, which excluded January 2024 storm costs. Fourth-quarter non-GAAP EPS was $0.47 against GAAP EPS of $0.36.
  • PacifiCorp Washington assets for $1.9 billion: Agreement to acquire select Washington generation, transmission and utility operations serving about 140,000 customers, at 1.4x estimated 2026 rate base. Manulife is expected to be a minority owner.
  • Three plants and grid assets included: The package also includes 4,500 miles of transmission and distribution lines and local utility operations across 2,700 square miles.
  • Five data center contracts, 430 MW: The contracts were executed in 2025 and early 2026 and build on PGE's industrial demand track record.
  • Two solar-plus-storage projects, 615 MW: The two hybrid projects total 615 MW, with 425 MW company-owned, awarded under the 2023 RFP.
Read the Q4 FY2025 earnings call summary

From this 10-K

Portland General Electric is a vertically integrated electric utility headquartered in Portland, Oregon, that generates, buys, sells, transmits and distributes electricity to customers in Oregon. It operates as a cost-based, regulated utility whose customer prices are set by the Public Utility Commission of Oregon, and it reports as a single business segment. Its state-approved service area covers 4,000 square miles entirely within Oregon, including 51 incorporated cities, and it served approximately 960,000 retail customers at December 31, 2025 after adding 10,000 during the year. The company was incorporated in 1930 and its common stock is listed on the New York Stock Exchange.

Portland General Electric Co., the 10-K for 2025

Portland General Electric is a vertically integrated electric utility headquartered in Portland, Oregon, that generates, buys, sells, transmits and distributes electricity to customers in Oregon. It operates as a cost-based, regulated utility whose customer prices are set by the Public Utility Commission of Oregon, and it reports as a single business segment. Its state-approved service area covers 4,000 square miles entirely within Oregon, including 51 incorporated cities, and it served approximately 960,000 retail customers at December 31, 2025 after adding 10,000 during the year. The company was incorporated in 1930 and its common stock is listed on the New York Stock Exchange.

Generation

It meets its retail load with its own plants and with power bought in the wholesale market. Its generating resources are six thermal plants, four wind farms and seven hydroelectric facilities. The five natural gas plants are Port Westward Unit 1, Port Westward Unit 2, Beaver, Coyote Springs Unit 1 and Carty Generating Station, and it owns a 20% interest in the Colstrip Units 3 and 4 coal-fired plant in Montana, operated by a third party. It owns and operates the Biglow Canyon Wind Farm in Sherman County, Oregon, with 217 turbines and 450 MW of nameplate capacity, and the Tucannon River Wind Farm in southeastern Washington, with 116 turbines and 267 MW. Its hydroelectric projects are Pelton/Round Butte on the Deschutes River, in which it holds a 50.01% interest alongside the Confederated Tribes of the Warm Springs Reservation of Oregon, four plants on the Clackamas River and one on the Willamette River. Its total resource capacity, owned and contracted, was 5,985 MW at December 31, 2025, of which 3,583 MW was its own generation.

Purchased power and storage

It buys hydroelectric power under long-term contracts with public utility districts in Washington for part of the output of projects on the mid-Columbia River, and it must buy power from qualifying facilities under federal law, with contracts with 67 online facilities providing 310 MW at the end of 2025. Its energy storage portfolio of approximately 522 MW includes Seaside Grid, a 200 MW battery system in Portland placed in service on July 8, 2025, which it owns, and Sundial, a 200 MW battery system in Troutdale owned by NextEra Energy Resources and contracted to PGE for 20 years. It owns 79.5% of the Kelso-Beaver (KB) Pipeline, a 17-mile pipeline that carries natural gas to its three plants near Clatskanie, Oregon, and it has access to 4.1 billion cubic feet of natural gas storage in Mist, Oregon.

Load and the grid

In 2025 it delivered approximately 32 million megawatt hours through 1,744 circuit miles of transmission lines operating at or above 57 kilovolts. Its all-time high system load peak of 4,498 megawatts came in August 2023, and in recent years its highest annual peaks have come in summer even though average winter loads remain higher. The filing states that new data center facilities and the high-tech manufacturing and digital service sector have increased deliveries to industrial customers. It takes part in the western Energy Imbalance Market and in 2025 signed an agreement to join the CAISO Extended Day Ahead Market in Q4 2026.

People

It had 2,877 employees as of December 31, 2025, of whom 666 were covered by two agreements with Local Union No. 125 of the International Brotherhood of Electrical Workers.

From Portland General Electric's annual report on Form 10-K for the year ended 31 December 2025. The filing

Written from the 10-K filed 17 February 2026: read the full 10-K.

The four quarters: Q1 FY2025 · Q2 FY2025 · Q3 FY2025 · Q4 FY2025

Income statement (profit and loss)

$ millionFY2025FY2024FY2023On the yearLast 8 years
Revenue3,5763,4402,923+4.0%
Operating income555512396+8.4%
Operating margin15.5%14.9%13.5%
Interest expense232211173+10.0%
Pre-tax income359350273+2.6%
Income tax53.037.045.0+43.2%
Effective tax rate14.8%10.6%16.5%
Net income306313228-2.2%
Net margin8.6%9.1%7.8%
Diluted EPS$2.77$3.01$2.33-8.0%
$ million except per share.
Read moreFree cash flow is operating cash flow less capital expenditure; the effective tax rate is income tax over pre-tax income; margins are the line over revenue. Gross profit is revenue less cost of revenue, and operating income is revenue less the company's own total costs, where the statement does not print those lines. Those four are arithmetic on the filed numbers; everything else is as filed. Money is in $ million as the company files it, or in $ billion by the switch above the tables; per share figures and share counts are as they are.

Cash flow

$ millionFY2025FY2024FY2023On the yearLast 8 years
Operating cash flow1,118778420+43.7%
Capital expenditure1,1891,2681,358-6.2%
Free cash flow-71.0-490-938
Free cash flow margin-2.0%-14.2%-32.1%
Cash from investing-1,196-1,297-1,358
Cash from financing142526778-73.0%
Depreciation and amortisation578496458+16.5%
Share-based compensation16.024.017.0-33.3%
Buybacksn/a0.00.0
Dividends paid225200179+12.5%
Dividend per share$2.08$1.98$1.88+5.1%
Diluted shares, weighted111m104m98m+6.3%
Shares outstanding at period end116m109m101m+5.7%

Balance sheet

$ millionFY2025FY2024FY2023On the yearLast 8 years
Shareholders' equity4,1333,7943,319+8.9%
Short-term borrowings0.00.0n/a
Debt4,6794,5394,131+3.1%
Operating lease liabilities27728616.0-3.1%
Finance lease liabilities263276289-4.7%
Other liabilities3,8783,6493,453+6.3%
Total liabilities and equity13,23012,54411,208+5.5%
Cash and equivalents76.012.05.0+533.3%
Receivables460456414+0.9%
Other assets12,69412,07610,789+5.1%
Total assets13,23012,54411,208+5.5%

10-K for the year ended 31 December 2025, filed 17 February 2026: the filing.