  • Oversubscribed $57.5 million equity raise: Gross proceeds were $57.5 million and net proceeds $53.1 million, driven by demand from leading institutional investors, which management said strengthened the capital base. Source
  • Land sales expected to begin in 2026: Management said the land has been prioritized for sale and expects monetization to begin in 2026, following the secured natural gas-based power. Source
  • Plant equipment nearly all received: Substantially all industry-scale equipment has arrived and commissioning is ongoing. The first unit operation has been tested, with operations targeted for the second quarter. Source
  • Mining sale agreements closing in: The CFO said the company is closing in on definitive agreements to sell all mining assets, most likely in the third quarter. Source
  • Recycling return expected above mining: Management said returns from solar panel recycling and industrial materials are expected to exceed hard-rock mining in speed, duration and absolute magnitude. Source

“During the first quarter of 2026, we completed the successful capitalization of our Company with aligned investors keen on participating in Comstock’s transformation into a multi-billion-dollar global, industrial materials enterprise”

Corrado De Gasperis, Comstock’s Chief Executive Officer

Guidance

AreaPeriodFigureAgainst last quarter
Silver Springs facility operations Sourcesecond quarter of 2026operations on line by the end of the second quarter of 2026Kept
Silver Springs real estate monetization Source2026start monetizing in 2026New
Promissory note excess cash returns SourceJanuary and May 2026$1.25 million returned and $0.55 million to be returned in January and May of 2026New

What changed from last quarter

  • New: A guaranty agreement with Great Basin Gas Transmission Company was entered into to support a surety arrangement. Source
  • Ended: All former promissory note commitments, including make-whole provisions, were extinguished. Source
  • New: Additional royalty and other rights sales from the northern district claims closed for $1.4 million. Source
  • New guidance: A timing was given for definitive agreements to sell the mining assets, most likely in the third quarter of 2026. Source
  • New guidance: A timing was given for the start of Silver Springs real estate monetization, in 2026. Source

Financing, capital and board

  • Oversubscribed $57.5 million equity raise: Gross proceeds were $57.5 million and net proceeds $53.1 million, driven by demand from leading institutional investors, which management said strengthened the capital base. Source
  • Cash balance $44.3 million in May: Cash and cash equivalents were $53.0 million at March 31, 2026 and $44.3 million at May 5, 2026, against $56.1 million at March 20 in the prior release. Source
  • Share count rose to 75.9 million: Per the prior release, shares outstanding were 51.9 million at December 31, 2025 and 74.1 million at March 20, 2026. Source
  • Final earn-out settled in shares: The final earn-out liability of about $5 million, tied to the prior acquisition of companies that comprise Bioleum, was settled in April 2026 by issuing 1,750,000 common shares. Source
  • Board expanded with three independent directors: Three independent directors, described as representing top shareholders, were added to the board. Source
  • Governance built for global scale: The CEO said the board and governance were expanded with the competencies and capacities to govern a global enterprise. Source

Silver Springs land and power

  • Guaranty backs power supply: The Great Basin guaranty starts at $22 million of surety and rises to $54.0 million by December 31, 2027, supporting the land monetization plan. Source
  • Land sales expected to begin in 2026: Management said the land has been prioritized for sale and expects monetization to begin in 2026, following the secured natural gas-based power. Source

“We have already tested the first unit operation and will continue moving through each unit operation as we assemble, complete and start operating the plant this quarter”

Dr. Fortunato Villamagna, President of Comstock Metals

Comstock Metals production start

  • Plant equipment nearly all received: Substantially all industry-scale equipment has arrived and commissioning is ongoing. The first unit operation has been tested, with operations targeted for the second quarter. Source
  • Tailings metal recovery design complete: Preliminary design and feasibility work is complete for a U.S.-based metal recovery solution for tailings, and partners have started bench and pilot testing. Source
  • Ohio and California logistics hub: An Ohio and California logistics and aggregation hub was established to serve two of the largest end-of-life solar panel markets in the United States. Source

Customers, sales and product upgrades

  • Sales capacity expanded across system: Marketing and sales capacity was increased across the system, which the release links to industry-scale production coming online. Source
  • Glass upgrades aimed at offtake revenue: Upgraded offtake equipment, especially for glass, is described as bringing high-quality customers and positioning the company for higher offtake product revenues. Source
  • Only certified R2v3/RIOS recycler: The company says it remains the only certified R2v3/RIOS recycler for solar panels and is undertaking the steps to become ISO certified. Source

“The rapidly rising industrial silver demand and recent silver prices have us well positioned to capitalize in both our recycling and mining businesses”

Mr. Judd Merrill, Comstock’s Chief Financial Officer and Comstock Mining President

Mining asset sales

  • Mining sale agreements closing in: The CFO said the company is closing in on definitive agreements to sell all mining assets, most likely in the third quarter. Source
  • Royalty sales add $1.4 million: Additional royalty and other rights sales from northern district claims brought total consideration to over $4.3 million, against about $3.0 million in the prior release. Source
  • Silver prices cited for both businesses: The CFO linked the company's positioning in recycling and mining to rising industrial silver demand and recent silver prices. Source

Bioleum renewable fuels

  • Farm-to-Fuel feedstock platform: The CEO described Bioleum's Farm-to-Fuel platform as addressing feedstock availability in renewable fuels, combined with its conversion technologies. Source
  • Capital raise and first demonstration: The team is finalizing its capital raise plans and deploying a first integrated, demonstration-scale solution, following the approach used for metals. Source
  • Hexas integration remains an objective: Support for Bioleum includes integrating and commercializing Hexas, which is listed among the 2026 corporate objectives. Source

Strategy and cost focus

  • Recycling return expected above mining: Management said returns from solar panel recycling and industrial materials are expected to exceed hard-rock mining in speed, duration and absolute magnitude. Source
  • Cost savings from focused enterprise: Monetizing legacy mineral and mining properties, plants and equipment is listed alongside realizing ongoing cost savings from a more focused enterprise. Source
  • Remaining Silver Springs real estate: Monetization of all other legacy, non-core real estate in Silver Springs, Nevada is listed among the 2026 corporate objectives. Source

Coming up, as management said on 8 May 2026

  • Second facility equipment and commissioning: Management's objectives include procuring equipment for the second industry-scale recycling and processing facility and commencing its commissioning. Source
  • Three more recycling sites: Site selection is to be completed for at least three additional solar panel recycling locations, with permitting to commence. Source
  • Mining asset sale agreements: Definitive agreements for the sale of all mining assets are being closed on, most likely in the third quarter, according to the CFO. Source
  • First facility profitable operation: Operating the first industry-scale facility in Silver Springs profitably is listed among the 2026 Metals objectives. Source

Figures management reported

FigureReported
Power secured Source250-300 megawatts equivalent

Risks management discussed

  • Financial: Management noted the Silver Springs land plan requires additional capital allocation to perfect and control the holdings. Source

Earlier plans management reported on

  • Met: The final earn-out liability was extinguished in April 2026, as contractually required. Source
  • Met: The 2026 objective to secure power for hyper-scale data center developments on Silver Springs land is listed as secured. Source
  • On track: The prior release described start-up as on plan for the second quarter; the current release expects operations on line by the end of that quarter.

Other quarters

Summarised with AI from the documents the company filed with the SEC. Every point is checked against the filing before it is shown: management’s own words word for word, figures against the line or table row they come from. A point that fails the check is left out. Source opens the filing at that line.