What management said about Q2 FY2026, from the documents filed with the SEC on 13 August 2026: press release. Guidance figures: 3 raised, 1 kept. The quarter’s numbers.

Key takeaways

  • Revenue rose 60% sequentially: Revenue of $15.1 million rose 60% from the first quarter and 145% year over year. The company said growth was 73% year over year excluding the presentation change. Source
  • Net loss widened on debt loss: Net loss was $22.6 million against $17.9 million in the first quarter. Management cited a $4.2 million loss on debt extinguishment and the new Briscoe overhead and depreciation, partly offset by lower SG&A. Source
  • Kati 1 posted first gross profit: Kati 1 completed 48 MW of construction on April 1 and was filled by Galaxy Digital. Site revenue rose 938% sequentially to $2.3 million, with first positive gross profit of $82 thousand. Source
  • Gross profit fell on Briscoe costs: Gross profit was $766 thousand against $1.9 million in the first quarter. Management cited $1.5 million of Briscoe maintenance, Kati 1 ramp costs and depreciation coming online before full revenue. Source
  • Pipeline expanded to 6.3 gigawatts: The development pipeline was about 6.3 gigawatts, up from 4.3 gigawatts in the first-quarter release, with major capacity growth across AI sites. Source
  • Kati 2 path toward 350 MW: The Kati 2 joint venture has an initial 100 MW of critical IT capacity and a defined path toward 350 MW. Soluna holds all Class A interests and serves as manager of the venture. Source
  • Full control of Dorothy 1 generation: Soluna now owns both the generation and the compute across all 50 MW of Project Dorothy 1, following the Briscoe, Dorothy 1A and Dorothy 1B purchases. Source
  • Cash and debt at quarter end: Unrestricted cash was $113.4 million and total debt was $33.1 million at June 30, 2026. Source

“This is Soluna’s fifth consecutive quarter of sequential revenue growth, and a 145% year-over-year increase that reflects the operating leverage we are building across the portfolio,”

John Belizaire, CEO of Soluna Holdings

Guidance

AreaPeriodFigureAgainst last quarter
Development pipeline Sourcecurrent, as of the quarter ended June 30, 2026approximately 6.3 gigawattsRaised from 4.3 GW
Kati 2 AI joint venture capacity SourcePhase I and Phase II100 MW initial critical IT capacity, path toward 350 MW (Phase II adds 250 MW)Raised from up to 300 MW+ site
Dorothy 3 campus capacity Sourcenot stated300 megawattsKept
Power designated for AI workloads Sourceduring the second quarter of 2026Rosa 242 MW; Hedy 198 MW; Ellen 145 MW; Fei 240 MWRaised from Rosa 187 MW; Hedy 120 MW; Ellen 100 MW; Fei 120 MW
Operating and under-construction capacity Sourceas of August 1, 2026approximately 192 MW operating; additional 14 MW under construction at Kati 1
Development pipeline by stage Sourcecurrentapproximately 1.6 GW planning and development; approximately 4.5 GW in assessment

What changed from last quarter

  • Guidance raised: Development pipeline raised from 4.3 GW to about 6.3 GW. Source
  • Guidance raised: Power designated for AI workloads increased at Rosa, Hedy, Ellen and Fei. Source
  • New: Joint venture agreement with Metrobloks for Project Kati 2 signed June 3, 2026; Soluna holds all Class A interests and serves as manager. Source
  • New: The 150 MW Briscoe Wind Farm was acquired April 1 for a $53.0 million base price, completing the generation side at Dorothy. Source
  • New: Dorothy 1B 49% interest acquired from Navitas on May 19 for approximately $8.8 million. Source
  • New: Ryan Carver appointed Chief Development Officer on July 16, 2026. Source
  • New: From Q2, pass-through electricity costs are presented gross in revenue and cost of revenue. Source
  • New: Briscoe’s first quarter under ownership added wind energy revenue to the results. Source

Results and growth drivers

  • Revenue rose 60% sequentially: Revenue of $15.1 million rose 60% from the first quarter and 145% year over year. The company said growth was 73% year over year excluding the presentation change. Source
  • Net loss widened on debt loss: Net loss was $22.6 million against $17.9 million in the first quarter. Management cited a $4.2 million loss on debt extinguishment and the new Briscoe overhead and depreciation, partly offset by lower SG&A. Source
  • Adjusted EBITDA loss narrowed: Adjusted EBITDA loss was $1.6 million, improved 25% from $2.1 million. Lower legal and consulting fees after the Briscoe close and lower compensation drove the improvement, alongside Dorothy 2 gross profit. Source

Segments and sites

  • Data hosting carried revenue mix: Data hosting revenue was $12.7 million for the quarter, against $6.7 million in the first quarter. Cryptocurrency mining revenue was $1.7 million, against $2.2 million in the first quarter. Source
  • Dorothy 1A reached 28% gross margin: Dorothy 1A revenue was $2.9 million, up 31% sequentially on Blockware and Canaan fleet ramps. Gross profit was $795 thousand; management called the 28% margin the highest of any site in the portfolio. Source
  • Kati 1 posted first gross profit: Kati 1 completed 48 MW of construction on April 1 and was filled by Galaxy Digital. Site revenue rose 938% sequentially to $2.3 million, with first positive gross profit of $82 thousand. Source

“With Briscoe and full ownership of Dorothy 1 in hand, we control the generation-to-compute chain at our flagship campus, and we are moving quickly to convert existing sites to AI and advance Dorothy 3.”

John Belizaire, CEO of Soluna Holdings

Costs, margins and presentation

  • Gross profit fell on Briscoe costs: Gross profit was $766 thousand against $1.9 million in the first quarter. Management cited $1.5 million of Briscoe maintenance, Kati 1 ramp costs and depreciation coming online before full revenue. Source
  • Electricity pass-through now reported gross: From Q2, pass-through electricity costs are shown gross in revenue and cost of revenue, adding $4.4 million to each. Gross profit, operating loss and net loss are unaffected. Source

Development pipeline and AI capacity

  • Pipeline expanded to 6.3 gigawatts: The development pipeline was about 6.3 gigawatts, up from 4.3 gigawatts in the first-quarter release, with major capacity growth across AI sites. Source
  • Pipeline split by development stage: About 1.6 GW is in planning and development, with PPA negotiations, ERCOT planning, AI feasibility and land acquisition underway. About 4.5 GW is in assessment with power partners. Source
  • Kati 2 path toward 350 MW: The Kati 2 joint venture has an initial 100 MW of critical IT capacity and a defined path toward 350 MW. Soluna holds all Class A interests and serves as manager of the venture. Source
  • Dorothy 3 campus grew to 300 MW: The Dorothy 3 campus grew to 300 megawatts. Management said it is moving quickly to convert existing sites to AI and advance the Dorothy 3 campus. Source

“That operating base is the foundation for the much larger AI build-out now taking shape across our pipeline.”

John Belizaire, CEO of Soluna Holdings

Dorothy vertical integration

  • Dorothy 1A stake bought from Spring Lane: Soluna acquired Spring Lane Capital’s 85.4% Class B interest in Dorothy 1A on April 15 for $16.5 million. Source
  • Briscoe wind farm acquired for $53 million: The 150 MW Briscoe Wind Farm was acquired April 1 for a $53.0 million base price. Source
  • Full control of Dorothy 1 generation: Soluna now owns both the generation and the compute across all 50 MW of Project Dorothy 1, following the Briscoe, Dorothy 1A and Dorothy 1B purchases. Source

Capital, cash and share count

  • Cash and debt at quarter end: Unrestricted cash was $113.4 million and total debt was $33.1 million at June 30, 2026. Source
  • ATM sales after quarter end: The company raised about $23.6 million under its ATM program after quarter-end. About 244.6 million shares were outstanding at the 10-Q filing date. Source
  • Six-month operating cash outflow: For the six months, net cash used in operating activities was $11.6 million and purchases of property, plant and equipment were $9.5 million. Source

Leadership and market profile

  • Ryan Carver named development chief: Ryan Carver was appointed Chief Development Officer on July 16, 2026. Management said he brings hyperscale AI delivery experience to lead the build. Source
  • Added to Russell indices: Shares were added to the Russell 3000 and Russell 2000 Value indices in the latest reconstitution, and new sell-side research coverage was initiated in recent weeks. Source
  • AI build-out follows operating base: Management described the operating base as the foundation for a much larger AI build-out now taking shape across the pipeline. Source

Coming up, as management said on 13 August 2026

  • Kati 2 Phase II adds 250 MW: Phase II of the Kati 2 joint venture would add a further 250 MW to the 100 MW Phase I. The release gives no timing for Phase II. Source
  • AI conversions and Dorothy 3 advancing: Management said it is moving quickly to convert existing sites to AI and to advance Dorothy 3. No dates were given. Source
  • Pending power term sheets for three sites: Projects Hedy, Ellen and Fei are advancing through power term sheets totalling 583 MW of behind-the-meter power aimed at AI and HPC workloads. Source

Risks management discussed

  • External: Revenue growth was partly offset by hashprice compression, according to management. Source
  • Operational: Briscoe maintenance, Kati 1 ramp costs and depreciation coming online ahead of full revenue weighed on gross profit in the quarter. Source

Other quarters

Summarised with AI from the documents the company filed with the SEC. Every point is checked against the filing before it is shown: management’s own words word for word, figures against the line or table row they come from. A point that fails the check is left out. Source opens the filing at that line.